Yes 2 on each side bolts on from underneath. the deck is two layerswith space between. 3/4" hole i think to get to the top sheet of steel. so socket can paas thru to tighten up bolts. used the touch up paint general sent for buying it. that way no exposed metal. you do have to take the carpet off the deck lid. but that is not hard. what took the longest was drilling the 3/4" holes. either the steel was very good or the holesaw very dull. maybe a little of both. :lol :thumbs :ssr :flag :seeyaREDIdrill said:Thanks for the info, Bob, on this thread and on the pm. You said that it bolts on; I guess that means that you have to drill holes in the decK? How many?? How long did it take to install? Do you know the name of the co. or person in Florida? Thanks again!
Charley